Fillable Printable Deliverables Schedule Template
Fillable Printable Deliverables Schedule Template
                        Deliverables Schedule Template

DELIVERABLES SCHEDULE EXAMPLES 
Example 1: RO Project - Plant Expansion 
Task 
No.  
Deliverable(s) 
Expected 
Completion Date 
Construction 
Cost ($) 
1  RO WTP expansion 
August 1, 2008   
1.1.1  RO Equipment & Chemical Modifications    $$$$$ 
1.1.2  High Service Pump Building   
$$$$$ 
1.1.3  High Service Pumps & Piping   
$$$$$ 
1.1.4  Transfer Pump Clearwell   
$$$$$ 
1.1.5  Transfer Pumps & Piping   
$$$$$ 
1.1.6  Degasifier & Scrubbers   
$$$$$ 
1.1.7  Sodium Hypochloride System   
$$$$$ 
1.1.8 Yard Piping   
$$$$$ 
1.1.9 Control System   
$$$$$ 
2 
Construction of Wells  
August 1, 2008   
2.1 
Production Wells - Construction / Testing Unit Items for 
four wells. Deliverable must include copies of all 
hydrogeologic data collected in the course of drilling and 
testing, in SFWMD specified format 
2.1.2  Construction Well #2    
$$$$$ 
2.1.3  Construction Well #3    
$$$$$ 
2.1.4  Construction Well #4    
$$$$$ 
2.1.5  Construction Well #5    
$$$$$ 
3  Wellhead and Raw Water Pipeline Construction  
August 1, 2008   
3.1 
Raw Water Pipeline Installation (approximately X feet of Y 
diameter) 
 $$$$$ 
3.2 Wellhead Construction      
3.2.1 Wellhead # 1   
$$$$$ 
3.2.2 Wellhead # 2   
$$$$$ 
3.2.3 Wellhead # 3   
$$$$$ 
3.2.4 Wellhead # 4   
$$$$$ 
3.2.5 Wellhead # 5   
$$$$$ 
   Total   $$$$$ 
Example 2: RO Project – Production Well Construction 
Task 
No.  
Deliverable(s) 
Expected 
Completion Date 
Construction 
Cost ($) 
1 
Construction of 24" diameter by approximately 1,100’ deep 
Floridan Aquifer well No 1 at the XYZ's ABC Wellfield 
August 1, 2008 
$$$$$ 
2 
Construct ion of 24" diameter by approximately 1,100’ 
deep Floridan Aquifer well No 2 at the YZ's ABC Wellfield 
August 1, 2008 
$$$$$ 
   Total  
$$$$$ 

Example 3: RO Project – Plant and Disposal Well 
Task 
No.  
Deliverable(s) 
Expected 
Completion Date 
Construction 
Cost ($) 
1 
Deep injection well construction - work in general 
consists of providing all materials, equipment, and labor to 
construct one Class I injection well, designated IW-1 
(approximately X feet deep by Y diameter), and one dual-
zone monitor well, designated DZMW-1 
August 1, 2008 
$$$$$ 
2 
3.0 mgd LPRO water treatment plant - Construct a 3.0 
million-gallon-per-day (mgd) capacity low pressure reverse 
osmosis (RO) water treatment plant including:  
August 1, 2008 
2.1  Membrane process associated    
$$$$$ 
2.2 
Building three 1.0 mgd RO units and associated 
equipment including cartridge filters, membrane feed 
pumps, and cleaning system, 
$$$$$ 
2.3  Chemical bulk storage and feed systems    
$$$$$ 
2.4 
Permeate degasification and odor control scrubber 
systems 
$$$$$ 
2.5  Permeate clearwell and transfer pumping system   
$$$$$ 
   Total  
$$$$$ 
Example 4: Reclaimed Water Project - Treatment  
Task 
No.  
Deliverable(s) 
Expected 
Completion Date 
Construction 
Cost ($) 
1 
Installation of on-site Sodium Hypochlorite Generation 
System 
August 1, 2008 
$$$$$ 
2 
Construction of Deep-bed Tertiary Filter System 
August 1, 2008 
$$$$$ 
3 
Construction of chlorine contact basin  
August 1, 2008 
$$$$$ 
   Total  
$$$$$ 
Example 5: Reclaimed Water Project - Distribution 
Task 
No.  
Deliverable(s) 
Expected 
Completion Date 
Construction 
Cost ($) 
1 
Installation of approximately  5,100' of 24" reclaimed water 
main from the WWTF to the ABC Development. 
May 1, 2008 
$$$$$ 
2 
Installation of approximately 1,300’ of 20” reclaimed water 
main from the ABC Development to XYZ Road. 
August 1, 2008 
$$$$$ 
   Total  
$$$$$ 

Example 6: Reclaimed Water Project – Storage and Treatment  
Task 
No.  
Deliverable(s) 
Expected 
Completion Date 
Construction 
Cost ($) 
1 
Construction of one (1) 5 MG reclaimed water storage tank 
No. 1 - Work will include site preparation, construction of 
tank foundation, tank walls and roof.  
March 1, 2008  $$$$$ 
2 
Construction of one (1) 5 MG reclaimed water storage tank 
No. 2 - Work will include site preparation, construction of 
tank foundation, tank walls and roof.  
August 1, 2008  $$$$$ 
3 
Installation of approximately 1100 feet of 48 inch and 900 
feet of 30 inch reject piping 
August 1, 2008  $$$$$ 
  Construction of two new aeration basins.  August 1, 2008  $$$$$ 
   Total   $$$$$ 
Example 7: Stormwater Recycling  
Task 
No.  
Deliverable(s) 
Expected 
Completion Date 
Construction 
Cost ($) 
1 
Construction of an approximate 57,600 cubic yard 
retention pond - includes excavation, embankment 
and seeding of 33 acres   
March 1, 2008  $$$$$ 
2 
Installation of two inflow pumps, each with a capacity 
of 15,000 GPM and two irrigation structures 
August 1, 2008  $$$$$ 
   Total   $$$$$ 
            
    