CONSTRUCTION REQUEST
CONTRACTOR COMPANY:
Cramer & Associates
FOR INFORMATION
RFI REQUESTER:RFI DATE:
RFI: 1.0
Robert Cramer08/16/07
PROJECT NAME:DESIGN FIRM:
Harris OverpassSchemmer
PROJECT NUMBER:CONST. PROJECT MANAGER:RFI RESPONDER:RFI DATE RESPONDED:
701781Larry DuensingSteve Kathol08/16/07
Requested Information/Clarification:
The first question is what the City would like to do where the expansion joints go through the median. This applies to
both the strip seal joint (Br sheet 59) and the modular join ts (Br sheet 46). At the barrier r expansion plates. Should there be
something similar at the median, or just a gap left for the expansion joint?
Response:
Theplanscallforagapandpreformedjointfillerinthemedianatthemodularexpansionjointsandstripseals.See
notation on Br. Sheet 43and Br. Sheet 59 respectively. The modular joint and stripseal will be continuous inthe slab,
below the median. The purpose of the preformed joint filler in the median is to mainly keep debris out of the joint.
Request for Information Page 1 of 1