1
(Rev 4/23/14)
CONSTRUCTIONCONTRACT
THISAGREEMENT,madethisdayof______________,20,uponthefollowingtermsandconditionsbetween:
OWNER: Robert N. Lynch, as Bishop of the Diocese of St. Petersburg, a Corporation Sole(hereafter
“Owner”),havingamailingaddressofP.O.Box40200,St.Petersburg,Florida33743,and
CONTRACTOR: 
(hereafterContractor),havingamailingaddressof
_______________________________________________________________________
PARISH/SCHOOL: _______________________________________________________________________
ADDRESS: _______________________________________________________________________
DESCRIPTIONOF 
WORK _______________________________________________________________________,
ARTICLEI.DEFINITION
Section1.01Contract.
The term "Contract" means and includes all contract documents, including but not limited to the Specifications;
Drawings;BiddingInstructions;ConstructionContract;ChangeOrders;AddendumandExhibits;andContractorsProposal.
Section1.02ProgressPayment
Theterm"ProgressPayment"means anyinstallmentoftheContractPricepayable inthemannerspecifiedherein.
Section1.03Work
Theterm"Work"meansalllabor,materials,andequipmentnecessarytobefurnishedbyContractortoperformfully
thecontract.
ARTICLE2.CONTRACTDOCUMENTS
Section2.01Signing
TheOwnerandContractorshallsigntwo(2)copiesofeachoftheContract.
Section2.02OrderofPrecedence
TheOrderofPrecedence withintheContractisasfollows:
1.ThisContract
2.Addendum
3.Specifications
4.Drawings
5.BiddingInstructions
6.ContractorsProposal
ARTICLE3.CONTRACTPRICE;PAYMENTS;WAIVERSOFLIENS

Section3.01ContractPrice
ThetotalContractPriceshallNOTexceed
DOLLARSANDNO/100
($
).
2
(Rev 4/23/14)
Section3.02Payments
a) 


b) AllmoniespaidtoContractorshallimmediatelybecomeandconstituteatrustfundandshallbeappliedby
Contractorforthebenefitofallpersonssupplyinglabor,materials,orequipmentinconnectionwiththe
Contract and shall not be diverted to any other purpose until the claims of all such persons have
been
discharged.
c) Payments,otherwiseduetheContractor,maybewithheldonaccountofdefectiveworknotremedied,or
claims filed or evidence that claims willbe filed: orif the ownerbelieves that the Contractor (i) can not
completetheworkfortheunpaidbalanceor(ii)cannotperformwithinthe
timespecifiedor(iii)doesnot
havethefinancialabilitytoperformor(iv)lapsesofinsuranceorfailureto provideevidenceofinsurance.
Section3.03ConditiontoPayments
ExceptforanyinitialpaymentcontainedinSection3.02,TheOwnershallnot berequiredtomakeanypaymentsunless
anduntilContractorsubmit
witheachinvoicea dulysignedandNotarizedWaiverofLienandanaffidavitthatContractorhas
paideveryworkeremployedbyitandhasreceivedpartial(inthecaseofprogresspayments)andfinal(inthecase offinal
payment)WaiversofLienfromallsubcontractorsandmaterialmensupplying
servicesand/ormaterialsontheProject.
Section3.04NoticeofCompletion
UponcompletionoftheProject,ContractorshallnotifyOwnerthattheProjectisreadyforfinalinspection.Thereafter,
OwnershallpromptlyinspecttheProjectand,ifitmeetswiththecontractedspecifications
,makefinalpayment.
Section3.05FinalPayment
NeitherPaymentto Contractor,noranyacceptance,occupation,orutilizationoftheProjectoranypartthereofby
OwnershallrelieveContractorofliabilityforfundsowedtoanysubcontractorsormaterialmen;fordefectivemateria ls;or
workmanshipusedintheconstructionoftheProject;
orforfailuretoconstructtheProjectaccordingtotherequirementsof
theContract.TheacceptanceoffinalpaymentshallconstituteawaiverofallclaimsbyContractoragainsttheOwnerexcept
thosepreviouslymadeinwritingandstillunsettled.
Section3.06Termination
IftheContractorfailstoperforminaccordancewith
thetermsofthisContract,oriftheOwnerisnotsatisfiedwith
theprogressorqualityoftheContractor’swork,OwnershallbeentitledtoterminatethisContractupongivingwrittennotice
toContractor.Intheeventofsuchtermination,Contractorshallbeentitledtopaymentforservices,laborandmaterials
to
date;providedhowever,Ownerdoesnotdisputesuchobligationinthenoticeoftermination. Terminationunderthisprovision
isnotawaiverofanyremediesinlaworequitythatOwnerhasforbreachofcontract,tortoranyothertheoryavailableunder
FloridalaworthisContract.Allsuchrights
arereservedbyowner.Nothinghereinshalllimitanyrightscontractormayhave
underthisContract.
ARTICLE4.PERMITS,TAXES,COMPLIANCE
Section4.01Permitsandfees
Contractorshallsecurethe buildingpermit,ifrequired,atOwner’scost;andContractorshallsecureatitsowncost
othersuchpermits,inspections,licenses,andapprovalsasmayberequiredunderallapplicablebuildingcodes,ordinances,laws
or regulations for the Work.Should any patented article, design
or process be used in the construction of the Project,
Contractorshallobtaintherighttousethesame,shallpayallroyaltiesandlicensefeeschargeableoroccurringbecauseofsuch
use,andshalldefendandholdOwneranditspropertyfreeandharmlessfromallcost,demands,suits andliabilities
arising
becauseofsuchuse.
Section4.02Taxes
Contractorshallpayemploymentandpayrolltaxesandcontributionsnoworhereafterwithrespecttoallpersons
employedbytheContractor.
3
(Rev 4/23/14)
Section4.03CompliancewiththeLaw
ContractorshallcomplyfullywiththeallFederal,StateandLocallaws,codes,andregulationsapplicabletothework
(including
allsafetyrequirements)andacknowledgesthatithasinformeditselfcompletelyinthisregardandagreesthatitwill
complyfullytherewith.ShouldContractorbecomeawarethatanyprovisionoftheContractisatvariancewithanysuchlaw,
rule,regulation,ordinance,or order,it shallpromptly givenoticein writing
toOwnerofsuch variance,and thenecessary
changesintheworkrequiredbytheContractshallbemadeandadjustedinthemannerspecifiedhereinforchangesinthe
Work.Contractorshallmaintainatalltimessuchsafeguardsforthe protectionofpersonsemployedontheProjectasthe
conditionsand
progressoftheWorkontheProjectmayrequire;ANDconspicuouslypostsuchsignsasmaybenecessarytowarn
personsofallhazardsasexistingwheretheProjectisbeingerected.
ARTICLE5.THEWORK
Section5.01LaborandMaterials
Contractorshallprovideandpayforalllabor,materials,equipment,tools,machinery,anddoallotherthingsnecessary
fortheproperperformance incompletionoftheWork.AnymaterialdeliveredorWorkdoneshallbecomethepropertyofthe
Ownerandshallnotberemovedwithoutthe
consentoftheOwner.
Section5.02RepresentationsofContractor:
Contractorrepresentsandwarrantsthat:(1)ithasreadallofthetermsandconditionsofthiscontract;(i.e.allcontract
documents);(ii)ithasphysicallyinspectedthejobsiteandisawareofalloftheconditions andlimitationsofthesite
thatmight
effecttheworkcontemplatedbythisagreement;(iii)itisawareofthe equipmentneededtoperformtheworkbaseduponthe
typeandcharacterofthe facilitiesatthejobsite;and(iv)itisnotrelyinguponanyrepresentationoropinionsofOwnerthat
arenot otherwisecontained
inthisContract.Basedupontheserepresentationsandwarranties,Contractorshallfullyperform
every detail of the requirements of the Contract and Contractorassumes fullrisk of any difficulties that it might occur in
performingthework.Contractor'sfailureofperformancewillnotbeexcusedonthebasisofignoranceofjob
siteconditions
orlimitationswhichgiverisetodifficultiesindoingthework;norwillitbethebasisforextensionoftimetocompletework.
ThisparagraphshallnotbeapplicabletoanyreportstobeprocuredbyOwnerforContractor’suseinperformingtheWork,until
suchtimeasOwner
providessuchreportstoContractor,who shallthenhaveten(10)daystoreviewthesame.IfContractor
failstoobject toanyinformationinsuchreports,thentheprovisionsofthis paragraphshallbecomeapplicable.
Section5.03QualityofMaterials
Contractorwarrantsthatallmaterialsusedintheconstructionof
theProjectshallbenew orrepairedasindicatedand
allworkmanshipandmaterialsusedintheconstructionoftheProjectshallbeofgoodquality,freefromfaultsanddefectsand,
in conformity with the Contract documents unless otherwise specified in the Contract. All Work not conforming to these
standardsshall
beconsidereddefective.
Section5.04DutiesofContractor
Contractor shall have full and complete responsibility for the Work until final acceptance. Contractor shall take
reasonablestepsto protecttheworkmen,property,andequipmentofothercontractorsagainstinjuryordamagearisingout
oforconnect edwiththeoperationsconductedbyContractorhereunder.Contractor
waivesallrightsitmighthaveagainst
OwnerforlossordamagetoContractor'sWork,propertyormaterialsarisingoutoforconnectedwiththeoperations ofthe
OwneroranyothercontractorshiredbyOwner,unlesscausedbytheOwner.
Section5.05AccesstoWork
ContractorshallprovideOwnerwithready
accessatanytimetotheWork,whetheritbeinpreparationorprogress,
forthepurposeofinspection.
4
(Rev 4/23/14)
Section5.06ChangesinWork
a) TheOwnerreservestherightbywrittenordertomakeanychangeincludingadditions,reductionsordeletions
in the work or materials to be furnished hereunder or may order additional work not shown in the Cont ra ct
Documents.If Contractorshallclaimthatanysuchchangeshallincrease
thecostortimeofperformanceoftheWork,
itshallbewithintencalendardaysofreceiptofsuchorder,givewrittennoticeofaclaimforadditionalcompensation
or for an extension oftime and theparties shall agree upon an equitable adjustment.Contractor shall not delay
proceedingwiththe
Workaschangependingsuchagreement.
b) Contractorshallnotbeentitledtoadditionalcompensationwhetherformodifications oradditionstothe
WorknotcoveredintheContractDocumentsorforextralaborormaterialsfurnishedunlessperformedorfurnished
pursuanttoa priorwrittenordersignedbyOwner.
c) AnychangedoradditionalWork
performedbyContractorasorderedbyOwner,shallbeperformedpursuant
to,inaccordancewith,andsubjecttoalltermsandconditionsoftheContract.
Section5.07Time
a) AlltimelimitsstatedintheContractDocumentsareoftheessenceoftheContract.
b) Contractorshallbeginworkonorbeforethedate
established,tobenotlessthanfourteen(14)daysfrom
issuanceofthebuildingpermitorsuchotherdateasthepartiesagreeinwritingandshallcarrytheworkforward
expeditiouslywithadequateforcesandcompleteiton____________(orwithinnumberofdays).
Section5.08Warranties;Guarantees
a) TheContractorwarrantsandguarantees
thatallequipmentandsystemsshallbeinstalledinaccordancewith
theContractDocumentsinthemostworkmanlikemannerandwillperformasspecifiedherein.
b) AtanytimeduringorafterinstallationContractorshallrepairandreplaceimmediatelyanyandallWork
togetherwithanyadjacentworkwhichmaybedisplaced
bysodoing,thatmaybedefectiveinmaterial,installation,
orworkmanship.
c) ContractorwarrantsandguaranteesallequipmentandsystemsfurnishedorinstalledbyContractorfora
periodof
fromthedateofacceptance,orforsuchlongerwarrantyperiodsasmaybe
accordedbythemanufacturerthereoforlawagainstdefectivematerials,designandworkmanship.
d) IntheeventContractorfailstoinitiatecorrectivemeasureswithinten(10)daysafterbeingnotifiedinwriting
bytheOwnerandcompletesuchcorrections
promptlytherefore,theOwnerisauthorizedtoproceedtohavesaid
defectrepairedandContractorshallpayallcostsandchargesthereforeupondemand.
e) Withregardto anywarrantiestobe furnishedforthework,services,equipmentormaterialsunderthis
Contract,Ownershallnotbeobligatedtowaiveanyexpressor
impliedwarrantiesasaconditiontoacceptingthe
writtenwarrantytobeprovided.
Section5.09UseofProject
TheusebytheOwnerofanyportionoftheProjectshallnotaffectthedatesandtimeswhenProgressPayments
becomeduetoContractorandshallnotprejudiceOwner'srightsundertheContract.
Section
5.10CleaningUp
Contractorshallconfineitsoperationatthesitetoareapermittedbylaw,ordinancesandtheContractDocumentsand
shallkeepthepropertyoftheOw ne r freeofalloftheaccumulatedrubbishandwastematerials.Uponcompletionofthe
Project,Contractorshallpromptlyremoveallrubbishandwaste
materialsalltemporarystructures,andallequipmentusedby
itinperformingtheContract.IfContractorfails tocleanup,Ownermaydosoandthecost thereofshallbechargedtothe
Contractor.
5
(Rev 4/23/14)
ARTICLE6.SUBCONTRACTORS
Section6.01PaymentstoSubcontractors
Totheextentthat Contractorshalluseanysubcontractors,Contractorshallpayeachsubcontractor,inanamount
equaltothepercentageofco mpletionallowedtoContractoronaccountofsuchsubcontractor'swork.Contractorshallalso
requiresubcontractortomakesimilarpaymentstoitssubcontractors.Ownershallnot
haveanyobligationtopayortoseethe
paymentofanymoniestoanysubcontractor.NothingcontainedintheContractDocumentshallcreateanycontractrelation
betweenOwnerandanysubcontractor.
ARTICLE7.INDEMNITYANDINSURANCE
Section7.01Indemnification
Eachpartyshalldefend,indemnify,andholdfreeandharmlesstheotherparty,theiraffiliatedentities,directors,
officers,employeesandagents,fromanyandallclaims,losses,damages,injuriesandliabilitiesarisingfromthedeathorinjury
ofanypersonorpersons,includingemployeesofContractoranditssubcontractors,
orfromdamageordestructionofany
propertycausedbyorconnectedwith,inwholeorinpart
,performanceoftheContractbyContractor,itssubcontractorsortheir
agentsoremployees.
Section7.02Insurance
a) Contractor,atitsownexpense,shallprocure,careandmaintainforallofitsoperationshereunderinsurance
incompaniesapprovedbytheOwnerwhichshallincludethefollowing:

1.Worker’sCompensationandEmployer'sLiabilityInsurancefor
him/herandallthoseperformingwork
underthisContract.
2.ComprehensiveGeneralLiabilityInsurancewithatleast OneMillion Dollars($1,000,000.00)forliability
coveragewiththe Owneraddedasan“additionalinsured”underthesubjectpoliciesandacertificatestating
suchsuppliedtothe Owner.
b) Before Contractor shall commence Work, Contractor shall give
to owner a Certificate of Insurance and
continuetomaintain andprovideproofofinsuranceduringthedurationofthisContract.
SECTION8.MISCELLANEOUS
Section8.01Litigation
a) ShouldanylitigationbecommencedbetweenthepartiesconcerningtheProject,anyprovisionoftheContract
ortheperformancethereof,theprevailingpartyshallbeentitledtocourtcostsandattorneyfeesinsuchlitigation.
b) ThevenueforanylitigationshallbePinellasCounty,Florida.
c) Thepartiesagreethatprior
toundertakinganylitigatio n,theywillfirstmediatethedisputeusingaCircuit
CourtMediatorfromtheSixthJudicialCircuit.Further,arbitrationmaybeusedtosettleContractmattersbutisnot
mandatorytoeitherparty.
Section8.02Assignment
Anyassignment,byoperationoflaworotherwise,inwholeorinpart,
byContractororContract,oftheWorktobe
performedoranyrighttopaymentorclaimsarisinghereunderwithoutthepriorwrittenconsentoftheOwnershallbevoid.
Anyattemptofanassignmentshall bedeemedadefaultunderthetermsofthisagreementandtheownershallbeentitled
tocancelthesameandexerciseanyandallotherrightsandremediesthatOwnermayhave.
Section8.03Severability
IfanyprovisionoftheContractshallbeheldinvalid,inwholeorinpart,thentheremainingprovisions,orportions
thereof,shallneverthelessbeandremaininfullforceandeffect.
6
(Rev 4/23/14)
Section8.04Asbestos
TheContractorshallcertifythatasbestoscontainingbuildingmaterials werenot usedonthisproject.Further,should
ContractorencounteranyACMduringtheperformanceoftheContractor’sduties,ContractorisrequiredtosuspendanyWork
andimmediatelyreportsuchfindingstoOwner,andshallcooperatewithOwneras
totheappropriateremedialactiontobe
taken.ContractorrepresentsandwarrantsthatanydemolitionandremovalofACMwillbedoneaccordingtoallapplicable
codes,ordinancesandlaw,whetherFederal,Stateorlocal.
Section8.05Coordination
TheContractorshallcoordinatehisactivitieswiththoseoftheOwnerandwiththe
Owner'sotherdirectContractors
whomaybeonthesite.TheOwnerreservestherighttochangethedatetoonemutuallyagreeduponinthe eventthata
specialoccasionpreventsvacancyofthefacility. Apreconstructionmeetingmusttakeplaceatleastfive(5)daysbefore work
commences.
Section8.06
SafeEnvironment
ContractoracknowledgesandagreesthatOwneriscommittedtoprovidingforthesafetyandwellbeingofits youth,
itselderlyandaged,anditsdisabled.Contractorrepresentsandwarrantsthatallpersonsaffiliatedorassociatedwiththe
Contractor who have access to the Premises by virtue of this Agreement,
shall meet the minimum level 2 screening
requirementsofSection435.04,FloridaStatutes,andContractorshallperformallnecessarybackgroundinvestigationstoendure
suchcompliance.IfOwnerisnotsatisfiedthatthisrequirementhasbeenmet,OwnermayrequestthatContractororany
personaffiliated with Contractor be prohibitedfrom accessing the
Premises,and Contractor shall immediately vacate the
PremisesorprohibitsuchpersoninviolationfromaccessingthePremises.Contractorshallbestrictlyliableforanyinjury,loss
and/ordamagetoanyperson,andshallindemnifyandholdOwnerharmlessfromanyclaims,resultingfromContractor’sfailure
tocomplywiththeserequirements.
CONTRACTOR: OWNER:
________________________________ ROBERT
N.LYNCH,asBishopofthe
DioceseofSt.Petersburg,aCorporationSole
By:
By:
PrintName: PrintName:
Title:

Pastor Approval
Login to HandyPDF
Tips: Editig or filling the file you need via PC is much more easier!
By logging in, you indicate that you have read and agree our Terms and Privacy Policy.