CONSTRUCTION PROGRESS REPORT(Work Breakdown)
WORK ITEM
(2)
TOTAL VALUE
OF WORK ITEM
(Dollars Only)
(4)
VALUE OF
MATERIALS
(Dollars Only)
(5)
TOTAL VALUE OF
COMPLETED WORK
AND MATERIALS
(a)
Previous Value
(Dollars Only)
(b)
Current Value
(Dollars Only)
(3) VALUE OF WORK COMPLETED
(1)
GSA 184A (REV. 3/2015)
GENERAL SERVICES ADMINISTRATION
TOTAL
GSA 184A (REV. 3/2015) BACK
General. GSA 184A shall be prepared by the contracting officer or his authorized representative. This form shall be used
on all construction contracts awarded under new construction and repair and alteration programs regardless of Delivery
Method. The GSA 184A provides part of the necessary documentation on construction progress. A copy of the form shall
be completed promptly prior to payment requests. The information provided on this form shall be kept current. Bonds
should be notated as the first item and the amount should be recorded only in Column (2) and recorded in Column 5 once
paid. Payment of the Bonds is recorded separately on the 184 item 11.
Specific. The form is generally self-explanatory. However, care must be exercised in filling out the items. Additional
guidance follows:
Column 1 - List the Work Breakdown structure of the original contract. For Design Build contracts list design components
separate from the actual construction work. For Construction Manager as Constructor (CMc) Design Phase Services
should be listed as an individual component.
Column 2 - Total Value of Work Item in contract.
Column 3 - Sub-column (a) cumulative amount completed through previous report; Sub-Column (b) current amount
completed since previous report.
Column 4 - Value of Materials stored materials and accepted by the Government during construction phase.
Column 5 - Value of Work in place and stored materials.