Fillable Printable Construction Bid
Fillable Printable Construction Bid
Construction Bid
BID PROCESS:
Construction estimating consists of three parts:
1. Quantity Survey
2. Price Extension
3. Bidding
Quantity survey is the physical removal of quantities from the working drawings
and specifications. This can be done using instruments such as a scale, tape,
wheel or a digitizer attached to a computer program.
Price extension is the portion of the estimate in which the contractors “price out”
the individual items, such as pricing out labor and material using current labor
rates and material prices.
Due to technological advancement and specialization in today’s construction
world, the prime contractor’s work is confined to those trades that the company
performs directly, usually without subcontracting. Depending on the type and
size of the projects and the bid strategy the prime contractor’s portion of the
total estimate may be only 5% to 20%.
The amount of direct work contributed to the project reflects the “risk” that the
prime contractor determines to take on a certain project. The remainder of the
work is them “brokered out” or subcontracted.
Bidding is the process whereby the prime contractor receives subcontractor and
vendor prices for labor, material and/or the combination of the two. It is a
systematic process of simplifying facts, reducing errors and omissions, relying
upon speed and efficiency to produce relatively accurate results. Tensions rise
because of the mental concentration required, apprehension over possible
errors and anxiety regarding financial success or failure. It has been said that
during the construction bid there is more competitive pressure and more
performance intensity than in any other industry.
In bidding, one is dealing with many divisions of the specifications, both broad
and narrow scope in nature. Subcontractor and vendor quotations are
matched to the specifications by the CSI 16 Division format. The various
subcontractor and vendor trades, personalities, ambiguities, omissions,
contradictions - not to mention having to meet state and federal regulations -
make “number crunching” within a few hours of bid time a major feat.
BID TIMELINE & STRATEGIES:
The bidding phase of estimating is probably the most vulnerable, talked
about and scrutinized phase of an estimate. There are many reasons for this, a
major one being the pressure that is placed on the estimator(s) on bid day.
Conflicts occur when legitimate and non-legitimate opportunities arise with the
arrival of the various sub bids or items. Below are some examples:
LEGITIMATE OPPORTUNITIES
1. Special equipment not available to other bidders.
2. Service of expert not available to other bidders.
3. Special material prices found through investigation, presumably not
available to other bidders.
4. Holding an exclusive low quotation not available to other bidders
and obtained without disclosing other sub bids.
5. Special construction techniques not used by other bidders.
6. Presumably a tighter, more accurate schedule.
NON-LEGITIMATE OPPORTUNITIES
1. Inside information given by the owner, engineer or architect not
given to other bidders.
2. Accepting and using low sub bids without obtaining confirmation
from sub bidder.
3. Asking a subcontractor for a special price, thus revealing other sub
quotations.
4. “Peddling” other sub bids to the advantage of low prices.
5. Reducing one or all sub quotations by a certain percentage to lower
the total contract amount without permission.
6. Not revealing obvious or hidden problems on the working drawings
or specifications.
Along with legitimate and non-legitimate opportunities are legal responsibilities,
which can be vague in meaning and based more on ethical reasoning than on
sound interpretation of the law. Whatever the reasoning, the name of the game
is to be the successful bidder. When actively bidding on the open market, a
successful contractor will only be low on 10% - 15% of all estimates. There are
also many inexperienced bidders learning the hard way by “winning” a great
number of contracts with unreasonably low bids. Most of these contractors fail
because the do not win enough low bids, and/or are too low to make a profit.
OVERVIEW OF THE BID PROCESS:
There are many ways to put a bid together, depending on the type of
construction and the personality of the contractor. The following bid procedure
is quite simple, straightforward and is fairly typical of most commercial
construction estimating.
It is made up of six basic parts using a color coding system. Colors are used to
aid the bid team in the final minutes of bid day to describe the various parts of
the bid. As the pressure mounts, it is sometimes easier to refer to a “brown” sheet
instead of a job summary sheet. The six parts are:
Quotation Sheets white
General Sheets white
General Conditions Sheets yellow
Sub Sheets white
Job Summary Sheets brown
Change Sheets green
Quotation sheets (white) are used to write down the various sub quotes that are
often received via telephone or will be the quotations received via fax. This
document is probably the most important part of the entire bid system.
Subcontractors either phone or fax in their quotations, section number and a
brief description of the items they are submitting. Other information such as
exclusions, additions, clarifications, special notes about prices, alternates, unit
prices and time constraints are also given. Federal regulations (i.e., WBE or DBE
firm) are also included. In addition, if the subcontractor is submitting a proposal
via telephone, one must indicate phone numbers, contractor numbers (where
applicable), date and time of the call and name of caller.
These items must be written neatly and precisely to make the quotation easily
readable, without omitting any information. The prime contractor then reads it
back to the subcontractor for clarification. On a typical bid day, well over one
hundred quotations can be phoned in or faxed within a 2-3 hour time period
(see Bid Timeline). When the quotation sheet is completed, it is placed in a
basket to be filed under section numbers and price, usually with the low sub bid
on top in a bid file organizer.
On paper this sounds relatively simple, but in reality a good many subcontractors
do not know their section numbers, have combination bids (one or more
sections), or do not have a complete bid. The person(s) receiving the sub prices
must have enough savvy and insight to decipher and translate them in a way
that the bid staff can understand and utilize the quotations.
An experienced bidder realizes that the best planned bidding procedure under
perfect control can suddenly be thrown into sheer chaos by the quantity of
incoming bids, and hasty analyses and omissions on the part of the
subcontractors. When the complexity of the incoming data exceeds the
capabilities of the bidding staff, a bid can totally collapse.
General sheets (white) consist of items the prime contractor wishes to actually
perform on the project. These items usually include demolition, foundation work,
flatwork (S.O.G), framing and miscellaneous construction items that the
subcontractors will typically exclude (see Appendix).
The title is clearly written at the top of the sheet. Under “description”, a brief
description of the item to be performed is written. Note that items are intended
to show they belong to the main description directly above (i.e., S.O.G.). To the
right is “quantity”, which is taken from the take-off sheets. Directly to the right of
the quantity numbers is the sign or unit of measure for the type of quantity such
as cy, lf, sf, etc.
Under “unit” and before “labor” is the cost per unit of labor. The cost per unit of
labor times the quantity is the total cost of labor shown in the “labor” column.
The same sequence follows for material costs. These unit costs do not include
labor taxes or material mark-up. In the far left margin are comparison price items
which include labor taxes. These comparison prices are used in case the prime
contractor wishes to deduct their items and use a subcontractor’s equivalent
quotation (see Change Sheet).
General Conditions (yellow sheet) is a fairly straightforward sheet. It lists the
general requirements found in the contract documents and also any equipment,
such as compressors, truck cranes, etc. not directly related to individual general
items. It also includes items that the subcontractors will exclude such as
scaffolding and weather protection. It is best to separate these items since they
are usually the ones that get duplicated during bid time.
By no means is this list complete, but it does list the essential items. The key to this
sheet is that the total cost of both labor and material should be between 5% - 8%
of the total bid amount. If the general conditions are greater than 8%, chances
are you are out of the ballgame before it starts. Conversely, if they are less than
4% you bought the ballpark.
Sub Sheets (white) are sometimes referred to as “spread sheets”. The Sub Sheets
are filled out using the specification as a guide and the specifications are taken
from the CSI 16 Division format, and are usually narrow scope in nature. The brief
descriptions are the title of each section of the specifications in the contract
documents.
Sub Sheets are the heart of the bid procedure. It is where the low prices are
recorded for each line item of the specification. The subcontractor names are
recorded along with the quotations. If they are bidding on material only, their
names are placed with their quotation in the “material” column. This is a very
simple concept, except that most subcontractors omit or combine items, in
hopes of being low due to an error of omission on the part of the prime
contractor. The Sub Sheet(s) must be compiled one hour prior to bid time,
usually plug-in figures for sub items not obtained by that time are used (see Bid
Timeline).
Job Summary (brown) is where the final numbers are compiled for the bid
proposal. The labor and material on both the General Conditions and the
General Sheets, as well as the labor on the sub sheet should be compiled 24
hours before bid time, leaving only the material side of the Sub Sheet to be
brought down. This provides more time to compute labor taxes and lessens the
number of items to worry about on bid day. One hour before bid time the Job
Summary should be completed up to the line labeled “Changes”.
Change Sheets (green) are used exclusively during the final hour before bid time.
This eliminates a lot of loose papers, although the other sheets are used as
references. The purpose of the Change Sheet(s) is to adjust sub prices -
especially late prices. Because most of the numbers have already been
compiled and carefully checked on the other sheets, they cannot be erased
and re-entered freely. Thus, when prices for items need to be changed, a basic
accounting add and deduct tactic is used to make the adjustments on the
Change Sheet.
It is important to note that all of the number totals must be carefully checked -
down the columns, as well as the extensions. Because this checking is so time
consuming, it is important to have certain portions of the bid procedure
completed well before bid time. All sheets must be checked and initialed by a
person not associated with the estimate (i.e., secretary). The person(s)
responsible for noting the quantities, prices and extensions must initial these items
for recordkeeping purposes.
Sub prices and how they are received can vary greatly depending on the
personality and reputation of the general contractor. For example, if a general
contractor is noted to be honest, fair and above board, most sub bids will come
in early, complete and with little confusion over deletions, or combinations of
divisions. On the other hand, if the general contractor is known to or rumored to
“shop prices”, subcontractors will usually call in their prices late, high and/or in
combinations so as to confuse the contractor. This is referred to as “breaking the
general contractor”. The pressure of competition among subcontractors also
makes significant differences in determining prices and how they are received.
Intuitive reasoning and guesswork are great assets for the estimator, along with
the ability to use bid strategies to make sound decisions during the process.
Bidding has been jokingly referred to as “playing poker”, and I find the similarities
closer to reality than one may think. You must bid high enough to make a profit,
yet low enough to get the job. Instead of being confined to a deck of cards,
you are dealing with hundreds of varying personalities and situations.
Strategies in successful competitive bidding are based upon a solid
understanding of the rules and elements that make up a bid and using them to
formulate a careful plan or method of application. Bid strategies cannot be
taught or learned overnight, but are acquired through experience. An excellent
book on this subject is “Construction Bidding for Profit” by William Park.
A bid timeline is important for the estimator to follow in order to use bid
strategies. By organizing the progression of events, the estimator can better
handle situations as they occur. The following timeline shows the sequence of
events on a typical bid day for a general contractor on a commercial
construction project. From the beginning of any estimate, the bid opening is the
ultimate goal. The majority of all bid openings are at 2:00 p.m. or 4:00 p.m. on a
Tuesday or Thursday. The timeline also shows a comparison of what goes on
during conventional bid day, and how the same bid process would proceed
using a computerized estimating program.
7:00
8:00
8:10
9:00
9:30
CONVENTIONAL BID PROGRAM
Senior estimator reviews all General Sheets
& General Conditions to make sure all items
are correctly written down and checked.
lower right corner.
Contact the person who is going to the
bid opening to make sure he knows
where the bid is opening & time.
Bid forms are correctly filled out
and addressed.
Bid envelope is properly addressed
with bid opening clearly typed on the
bid opening to make sure he knows
where the bid is opening & time.
Bid forms are correctly filled out
and addressed.
Bid envelope is properly addressed
with bid opening clearly typed on the
COMPUTER BID PACKAGE
Get the bid organizer labeled correctly &
have enough quotation sheets with the
proper information at all receiving areas.
Senior estimator reviews computer
to make sure all General Construction
Items & General Conditions items
are formatted correctly.
lower right corner.
Contact the person who is going to the
Meet with bid receivers and go over the
questions you wish them to ask the various
subs concerning their quotations.
Make sure the main computer is
functioning properly and all receiving
terminals are working properly.
Meet with bid receivers and go over the
questions you wish them to ask the various
subs concerning their quotations.
& miscellaneous structural steel are arriving.
Many one-man contractors call in early before leaving
their offices or homes to work in the field.
Inquiring phone calls are made to make sure that you
Early sub prices are beginning to arrive, usually
adjustments to concrete prices, lumber, etc. which are
called in on the previous day.
Sub bids from material suppliers, i.e. rebar, wwm &
computer screen.
Make final adjustments to General Sheets
& General Conditions Sheets using early
entries on the change sheet.
are covered on items that are predominantly excluded,
or to find further coverage on items you are questioning.
Make final adjustments to General Sheets
& General Conditions Sheets using the
Meet with the bid team. Update them as to
bid strategies and what has occurred to this
point. Divide up the bid responsibilities, i.e.
Material suppliers, such as Divisions 8, 9 & 10
begin to call or fax in.
Meet with the bid team. Update them as to
bid strategies and whey you may need them.
alternates, W.B.E & D.B.E, specialty items
and breakouts.
BID TIMELINE & STRATEGIES
The following is a generalization of the time of events. Bid time: 2:00 p.m.
9:40
10:00
11:00
12:00
1:00
On Change Sheet:
1:15
1:20
Four hours before bid time, sub prices start coming in
on a regular basis.
On the main computer screen, all sub items
are appearing, with low subs being entered
Call Architect with final inquiries, if any.
Call Architect with final inquiries, if any.
inquiring about their quotations.
All incoming prices are placed in the
quotation basket to be reviewed when
enough items merit reviewing. Inquiring
phone calls are made by the bid team.
on each item. The head estimator makes
inquiries of the computer as to the status of
questionable sub items. If needed, head
estimator can place calls to various subs
Sub prices are removed from the quotation
basket grouped will low prices on top and
filed within the bid organizer. Low sub
quotations are being entered on the sub
Between the hours of 11:00 & 12:00 the bulk of the
incoming sub prices arrive.
Low sub prices are appearing on the screen
with the computer notifying the estimator as to
sheet. All members of the team are working.
Alternate prices are being computed, as
well as W.B.E & D.B.E. requirements.
The computer is notifying the estimator as
ambiguities and line items not yet covered.
to all ambiguities and line items not covered.
Additional estimator arrives to aid in calling
back subs concerning their quotations.
Low sub prices are still being written in on the
Sub Sheet. Alternate prices are being
computed as well as the W.B.E. & D.B.E
requirements.
The shuffling of combination pricing is
occurring utilizing a bid team member full time.
Larger sub prices begin to come in, as the bulk of the
incoming prices begins to drop off.
Sub Sheet(s) should be fairly complete with
plug-in items reviewed and identified.
Plug-in items are processed and Sub Sheet(s)
should be completed at this time.
point from now on.
Critical Time: Sub Sheet is filled in and totaled.
All line items are scrutinized. Extensions &
totals are independently checked.
Job Summary Sheet (brown) is filled in
completely up to Change Sheet.
Alternates are being computed.
W.B.E. & D.B.E. requirements are
being computed.
Total cost of project can be attained at any
Change Sheet is totaled.
Making all corrections, additions or deletions
on Change Sheet. Reviewing Mechanical &
Electrical sub quotes.
All alternates are totaled. W.B.E. & D.B.E.
requirements are checked for compliance.
Late sub quotations come in. Mechanical
& Electrical prices start to appear.
Computer is evaluation all late prices with bid
team visualizing or manually making changes
when alerted.
1:30
1:50
2:00
BID TIME
Computer forms Change Sheet.
Computer waits for last minute sub quotes.
Alternates, W.B.E. & D.B.E. requirements
Estimator asks for total bid cost.
Determination of Overhead & Profit.
Computer totals & waits for further changes.
are printed.
Dummy bid form is filled in.
Determination of Overhead & Profit.
Job Summary is totaled including changes.
Job Summary is checked.
Overhead & Profit is added.
Alternates, W.B.E. & D.B.E. requirements
are written on dummy bid form.
Computer goes to Job Summary.
Bid total is computed.
Bid is given to runner over the phone.
Late changes are made, if needed.
Bid total is made.
Bid is given to runner over the phone.
Late arriving sub quotations are coming in. The runner
at the bid opening calls in reviewing his/her position &
stays on phone.
Specifcation Division #:
WBE:
MBE:
Sub-Bid:
Material Quote:
PROJECT:
FIRM QUOTING:
ADDRESS: TELEPHONE:
QUOTED BY: F.O.B.:
SPEC. DIVISION #: ADDENDA:
QUOTING ON:
EXCLUSIONS:
VERBAL QUOTE: TELEPHONE QUOTE: WRITTEN CONFIRMATION:
DATE: TIME: RECEIVED BY:
QUOTATION
Project : Estimator: Page of
Location: Architect:
Project Size: SF
Date: / / Sheet Title: General Sheet
Checked By: Extensions Checked by:
Notes Quantity unit Labor Extension unit Material Ext.
SHEET TOTALS
Description