Login

Fillable Printable Registered Project Checklist

Fillable Printable Registered Project Checklist

Registered Project Checklist

Registered Project Checklist

LEED f or New Construction v3.0
Registered Proj ect Checklist
Project Name:
Project Address:
Yes ? No
0 0 0 Sustainable Sites
26 Points
Y
Prereq 1
Construction Activity Polluti o n Prevention
Required
Credit 1
Site Selection
1
Credit 2
Developm ent Density & Commu n ity Connectivity
5
Credit 3
Brownfield Redevelopment
1
Credit 4.1
Alternative Tra n sportation, Public Transportation Access
6
Credit 4.2
Alternative Tra n sportation, Bicycle Storage & Changing Rooms
1
Credit 4.3
Alternative Tra n sportation, Low-Emitting & Fuel-Efficient Vehicles
3
Credit 4.4
Alternative Tra n sportation, Parking Capacity
2
Credit 5.1
Site Develop ment, Protect of Restore Habitat
1
Credit 5.2
Site Develop ment, Maximize Open Space
1
Credit 6.1
Stor m water Design, Quantity Control
1
Credit 6.2
Stor m water Design, Quality Control
1
Credit 7.1
Heat Island Effect, Non-Roof
1
Credit 7.2
Heat Island Effect, Roof
1
Credit 8
Light Po llution Reduction
1
Yes ? No
0 0 0 Water Efficiency
10 Points
Y
Prereq 1
Water Use Reduction
Required
Credit 1
Water Efficient Landscaping
2 to 4
50 % Reduction 2
No Potable Water Us or Irrigation 4
Credit 2
Innovative Wastewater Technolog ies 2
Credit 3
Water Use Reduction
2 to 4
30 % Reduction 2
35 % Reduction 3
40% Reduction 4
Yes ? No
0 0 0 Energy & Atmosphere
35 Points
Y
Prereq 1
Fundamental Commissioning of the Building En ergy Systems
Required
Y
Prereq 1
Minimu m Energy Perfor m ance
Required
Y
Prereq 1
Fundamental Refrigerant Management
Required
Credit 1
Optimize Energy Perform ance
1 to 19
12% New Buildings or 8% Existing Building Renovations
1
14% New Buildings or 10% Existing Building Renovations
2
16% New Buildings or 12% Existing Building Renovations
3
18% New Buildings or 14% Existing Building Renovations
4
0
LEED Description - Addendum 3
20% New Buildings or 16% Existing Building Renovations
5
22% New Buildings or 18% Existing Building Renovations
6
24% New Buildings or 20% Existing Building Renovations
7
26% New Buildings or 22% Existing Building Renovations
8
28% New Buildings or 24% Existing Building Renovations
9
30% New Buildings or 26% Existing Building Renovations
10
32% New Buildings or 28% Existing Building Renovations
11
34% New Buildings or 30% Existing Building Renovations
12
36% New Buildings or 32% Existing Building Renovations
13
38% New Buildings or 34% Existing Building Renovations
14
40% New Buildings or 36% Existing Building Renovations
15
42% New Buildings or 38% Existing Building Renovations
16
44% New Buildings or 40% Existing Building Renovations
17
46% New Buildings or 42% Existing Building Renovations
18
48% New Buildings or 44% Existing Building Renovations
19
Credit 2
On-Site Rene wable Energy
1 to 7
1% Renewable Energy
1
3% Renewable Energy
2
5% Renewable Energy
3
7% Renewable Energy
4
9% Renewable Energy
5
11% Renewable Energy
6
13% Renewable Energy
7
Credit 3
Enhan ced Commissioning
2
Credit 4
Enhan ced Refrigerant Mana g ement
2
Credit 5
Measurement & Verification
3
Credit 6
Green Power
2
Yes ? No
0 0 0 Materials & Resources
14 Points
Y
Prereq 1
Stor age & Collection of Recyclables
Required
Credit 1.1
Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
1 to 3
Maintain 55% of Existing Walls, Floors & Roof
1
Maintain 75% of Existing Walls, Floors & Roof
2
Maintain 95% of Existing Walls, Floors & Roof
3
Credit 1.2
Building Reuse, Maintain 50% of Interior Non-Structural Elements
1
Credit 2
Construction Wa ste Managem ent
1 to 2
Divert 50% from Disposal
1
Divert 50% from Disposal
2
Credit 3
Materials Reuse
1 to 2
Reuse 5%
1
Reuse 10%
2
Credit 4
Regional Materials
1 to 2
10% (post-consumer + ½ pre-consumer)
1
20% (post-consumer + ½ pre-consumer)
2
Credit 5
Recycled Content
1 to 2
10% Extracted, Processed & Manufactured Regionally
1
20% Extracted, Processed & Manufactured Regionally
2
Credit 6
Rapidly Renewable Materials
1
Credit 7
Certified Wood
1
Yes ? No
LEED Description - Addendum 3
0 0 0 Indoor Environmental Q uality
15 Points
Y
Prereq 1
Minimu m IAQ Performance
Required
Y
Prereq 2
Enviro n mental Tobacco Smoke (ETS) Control
Required
Credit 1
Outdoor Air Delivery Monitori n g
1
Credit 2
Increased Ventilation
1
Credit 3.1
Construction IAQ Manageme n t Plan, During Construction
1
Credit 3.2
Construction IAQ Manageme n t Plan, Before Occupancy
1
Credit 4.1
Low-Emitting Materials, Adhesives & Sealants
1
Credit 4.2
Low-Emitting Materials, Paints & Coatings
1
Credit 4.3
Low-Emitting Materials, Carpet Systems
1
Credit 4.4
Low-Emitting Materials, Composite Wood & Agrifiber Products
1
Credit 5
Indoor Chemical & Pollutant So u rce Control
1
Credit 6.1
Controllability of Systems, Lighting
1
Credit 6.2
Controllability of Systems, Thermal Comfort
1
Credit 7.1
Thermal Comfort, Design
1
Credit 7.2
Thermal Comfort, Verification
1
Credit 8.1
Daylight & Views, Daylight 75% of Spaces
1
Credit 8.2
Daylight & Views, Views for 90% of Spaces
1
Yes ? No
0 0 0 Innovation in Design
6 Points
Credit 1.1
Innovation in Design: Provide Specific Title
1
Credit 1.2
Innovation in Design: Provide Specific Title
1
Credit 1.3
Innovation in Design: Provide Specific Title
1
Credit 1.4
Innovation in Design: Provide Specific Title
1
Credit 1.5
Innovation in Design: Provide Specific Title
1
Credit 2
LEED
®
Accredited Professional
1
Yes ? No
0 0 0 Regional Priority
4 Points
Credit 1.1
Region al Priority: Provide Specific Title
1
Credit 1.2
Region al Priority: Provide Specific Title
1
Credit 1.3
Region al Priority: Provide Specific Title
1
Credit 1.4
Region al Priority: Provide Specific Title
1
0 0 0
Project Totals (pre-certification estimates)
100 Points
Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points
LEED Description - Addendum 3
Login to HandyPDF
Tips: Editig or filling the file you need via PC is much more easier!
By logging in, you indicate that you have read and agree our Terms and Privacy Policy.