Login

Fillable Printable Construction Budget Worksheet

Fillable Printable Construction Budget Worksheet

Construction Budget Worksheet

Construction Budget Worksheet

Mt. McKinley Bank
Item Budget
1. Home Package Kit (If Applicable)
2. Excavation / Backfill
3. Water / Sewer - Well / Septic
4. Foundation / Footings / Basement
5. Rough Framing
6. Roof Covering / Finish
7. Windows
8. Exterior Finish / Garage Door / Decks
9. Electrical Rough-in
10. Plumbing Rough-in (Including tub)
11. Heating Rough-in & Boiler / HRV
12. Insulation / Vapor Barrier
13. Sheetrock / Mud & Tape
14. Interior Painting
15. Interior Finish (Trim, doors, etc.)
16. Electrical Finish (Fixtures, covers, etc.)
17. Plumbing Finish (Toilets, sinks, faucets)
18. Cabinets / Countertops (Kitchen & bath)
19. Flooring (Vinyl, tile, carpet, etc.)
20. Appliances (Kitchen & Washer / Dryer)
21. Reserve Overruns (15% of budget)
22. Draw Request Fee ($50 each request)
23. Loan closing costs (3.5% of loan amount)
24. Survey / Inspections / Energy Rating / NOC
25. Land Payoff (If Applicable)
TOTAL BUDGET
Name:
Property Address:
Construction Budget Worksheet
Mt. McKinley Bank
Construction Budget Worksheet
Item Description
1. Home Package Kit
a. Purchase price of kit (Nelson Homes, Pacific Homes, etc.)
2. Excavation/Backfill
a. All dirt work including clearing, landscaping, and driveway
b. Fuel tank, power pole installation and labor
3. Water/Sewer Well/Septic
a. Well installation or holding tank and labor
b. Septic installation or city hook-up and labor
4. Foundation/Footing/Basement
a. Foundation installation and labor
5. Rough Framing
a. All materials, including framing and labor
b. Chimney, garage doors, and exterior doors
6. Roof covering/Finish
a. All materials for roofing and labor
7. Windows
a. All materials for windows and labor
8. Exterior Finish
a. Siding material, labor. Decking material, labor. Exterior window trim.
9. Electrical Rough-in
a. Materials and labor (wiring, attachments, breakers and box)
10. Plumbing Rough-in
a. Materials to include Bath tub and labor (piping, septic hook-up)
11. Heating Rough-in, Boiler & HRV
a. Furnace/Boiler cost with installation and all labor
b. Radiant heat cost and labor
12. Insulation/ Vapor Barrier
a. Materials and labor
13. Sheetrock/Mud & Tape
a. Materials (drywall, mud, texture), all labor
14. Interior painting
a. Materials and all labor
15. Interior Finish
a. Finish trim, interior doors, molding, fireplace, wood stove, pellet stove
16. Electrical Finish
a. All fixtures, face plates, installation and labor
17. Plumbing Finish
a. Toilets, sinks, faucets - installed to completion
18. Cabinets/Countertops Kitchen and bath
a. Cost and installation
19. Flooring
a. Cost and labor including all carpet, laminate, and tile
20. Appliances
a. Cost and installation (refrigerator, washer/dryer, dishwasher, range, etc.)
21. Reserve Overruns
a. 15% or more.
22. Draw Request Fee - $1800
a. $50 each request for a draw. Typically 2 per month for 18 months.
23. Loan Closing Costs
a. Typically 3.5% - 4% of total loan amount.
24. Survey/Energy Rating & Inspections/NOC - $1100/$1800/$22 total $2922
a. Plot plan, PUR 101 energy rating/PUR 102 inspection log, & NOC
25. Land Payoff (if applicable)
a. If land not paid off, enter payoff figure here. Taxes must be paid in full.
Login to HandyPDF
Tips: Editig or filling the file you need via PC is much more easier!
By logging in, you indicate that you have read and agree our Terms and Privacy Policy.