Login

Fillable Printable Sample Statement of Work for Services - IBM

Fillable Printable Sample Statement of Work for Services - IBM

Sample Statement of Work for Services - IBM

Sample Statement of Work for Services - IBM

Z125-8381-00 SOW.doc 11-2009 Page 1 of 5
Sample Statement of Work for Services
This an example and your Statement of Work may vary given your specific requirements
and the related IBM engagement.
IBM Implementation Services for Power Systems – IBM Systems Director
1. Scope of Work
Under the IBM Implementation Services for Power Systems – IBM Systems Director (“Services”), IBM will
install and configure IBM Systems Director on a designated management server in an AIX environment
and configure up to four endpoints to be monitored by IBM Systems Director.
IBM will identify the details relating to the Services in the Schedule for IBM Implementation Services for
Power Systems – IBM Systems Director (“Schedule”) which accompanies this Statement of Work
(“SOW). The Schedule will also identify locations at which the Services will be provided and any
applicable optional Services selected.
2. Definitions
IBM Systems Director - a platform-management foundation that streamlines the way physical and virtual
systems are managed across a heterogeneous environment.
Services Recipient – means any entities or individuals receiving or using the Services, or the results or
products of the Services.
3. Services
3.1 Services Coordination
3.1.1 IBM Responsibilities
The purpose of this activity is to provide an IBM Services specialist who will be IBM’s focal point during
performance of the Services. The IBM Services specialist will:
a. review the SOW, and any associated documents, with Customer Point of Contact;
b. establish and maintain communications through Customer Point of Contact, as defined in the
section entitled “Customer Point of Contact Responsibilities” below;
c. review and administer the Project Change Control Procedure with Customer Point of Contact, as
defined in the Schedule; and
d. coordinate and manage the technical activities of IBM’s assigned personnel.
Completion Criteria:
This is an ongoing activity that will be considered complete at the end of the Services.
Deliverable Materials:
None
3.1.2 Customer Point of Contact Responsibilities
Prior to the start of the Services, your will designate a person ("Customer Point of Contact") to whom all
communications relative to the Services will be addressed, and who will have the authority to act on
Customer’s behalf in all matters regarding this SOW. Customer Point of Contact will:
a. serve as the interface between IBM’s project team and all of your departments participating in the
Services;
b. attend status meetings;
c. obtain and provide applicable information, data, consents, decisions and approvals as required by
IBM to perform the Services, within two business days of IBM’s request; and
d. help resolve Services issues, and escalate issues within Customer’s organization, as necessary.
3.1.3 Customer General Responsibilities
IBM's performance is dependent upon Customer management and fulfillment of your responsibilities, at
no charge to IBM. Any delay in performance of Customer responsibilities may result in additional charges
Z125-8381-00 SOW.doc 11-2009 Page 2 of 5
and/or delay of the completion of the Services. Such additional charges and/or delay will be handled in
accordance with the Project Change Control Procedure. Customer will:
a. make appropriate personnel available to assist IBM in the performance of its responsibilities;
b. provide safe access, suitable office space, supplies, furniture, high speed connectivity to the
Internet, and other facilities for IBM’s personnel while working at the location(s) specified in the
applicable Schedule;
c. ensure that current maintenance and license agreements are in place with applicable vendors for
those products and services upon which IBM is relying to provide the Services described herein;
d. allow IBM, at the completion of the Services, to cite Customer’s company name and the general
nature of the Services to other potential customers;
e. authorize International Business Machines Corporation and its subsidiaries (and their successors
and assigns, contractors and IBM Business Partners) to store and use Customer’s business contact
information wherever IBM does business, for use in connection with IBM products and services or in
furtherance of IBM’s business relationship with Customer;
f. obtain any necessary consents and take any other actions required by applicable laws, including but
not limited to data privacy laws, prior to disclosing any of its employee information to IBM.
Customer also agrees that with respect to data that is transferred or hosted outside of the United
States, Customer is responsible for ensuring that all such data transmitted outside of the United
States adheres to the laws and regulations governing such data;
g. be responsible for the content of any database, the selection and implementation of controls on its
access and use, backup and recovery and the security of the stored data. This security will also
include any procedures necessary to safeguard the integrity and security of software and data used
in the Services from access by unauthorized personnel;
h. be responsible for the identification and interpretation of any applicable laws, regulations, and
statutes that affect Customer’s existing application systems, programs, or data to which IBM will
have access during the Services. It is Customer’s responsibility to ensure the systems, programs,
and data meet the requirements of those laws, regulations and statutes.
3.1.4 Mutual Responsibilities
IBM and you will each comply with applicable export and import laws and regulations, including those of
the United States that prohibit or limit export for certain uses or to certain end users, and each of us will
cooperate with the other by providing all necessary information to the other, as needed for compliance.
Each of us shall provide the other with advance written notice prior to providing the other party with
access to data requiring an export license.
3.2 IBM Implementation Services for Power Systems – IBM Systems Director
3.2.1 IBM Responsibilities
Activity 1 - Project Kickoff
The purpose of this activity is to facilitate a high-level project kickoff conference call with the Customer for
up to two hours on a mutually agreed upon date and time.
Task 1 - Conduct Planning Session Conference Call
IBM will:
a. define the services team roles and responsibilities;
b. review objectives, goals, and critical success factors;
c. review completion criteria and critical dates;
d. review implementation plans and identify the tasks to be completed; and
e. schedule the onsite planning session and installation activities.
Completion Criteria:
This activity will be complete when IBM has conducted the remote planning session conference call.
Deliverable Materials:
None
Z125-8381-00 SOW.doc 11-2009 Page 3 of 5
Activity 2 - Planning
The purpose of this activity is to collect the IBM Systems Director requirements and create a plan for
installation of IBM Systems Director software.
Task 1 - Conduct Onsite Planning Session
a. IBM will conduct a planning session for up to two hours with your designated personnel, to:
(1) discuss your IBM Systems Director requirements;
(2) define the detailed IBM Systems Director installation activities; and
(3) identify the required AIX operating system upgrades and/or modification requirements. This
would include patches or technology level upgrades that are pre-requisites for IBM Systems
Director.
Task 2 - Document Findings
IBM will:
a. document the outcome of the onsite planning session in a IBM Systems Director Installation Plan;
and
b. prepare IBM Systems Director Implementation Worksheets which detail the platform management
design.
Completion Criteria:
This activity will be complete when IBM has:
conducted the onsite planning session, and
delivered the IBM Systems Director Installation Plan and IBM Systems Director Implementation
Worksheets to Customer Point of Contact.
Deliverable Materials:
IBM Systems Director Installation Plan
IBM Systems Director Implementation Worksheets
Activity 3 - Installation and Configuration
The purpose of this activity is to install and configure onsite IBM Systems Director software in accordance
with the IBM Systems Director Installation Plan.
Task 1 - Prepare for Implementation of IBM Systems Director
IBM will:
a. review the IBM Systems Director Installation Plan and IBM Systems Director Planning Worksheets
with Customer Point of Contact;
b. prepare the AIX logical partitions, up to four, on the IBM Power System by implementing the filesets
required for IBM Systems Director management; and
c. review the firewall/security settings which may block the ports used by IBM Systems Director. If any
ports are found to be blocked which are necessary for IBM Systems Director, unblock the respective
ports with the Customer’s assistance.
Task 2 - Install and Configure IBM Systems Director
IBM will:
a. configure the filesets for IBM Systems Director on the designated management server;
b. install the filesets for IBM Systems Director on the designated management server;
c. perform a system discovery to assign four endpoints which are to be monitored by IBM Systems
Director on the designated management server;
d. provide basic skills instruction for up to two members of your systems operation staff. This basic
skills instruction will be conducted during the “Installation and Configuration” activity and will not be
delivered as a separate education activity. Your systems operation staff members must have basic
knowledge of the software products being installed as part of this activity; and
e. create and deliver a IBM Systems Director Installation Record that identifies the configuration
activities performed as part of this Services; and
Z125-8381-00 SOW.doc 11-2009 Page 4 of 5
Completion Criteria:
This activity will be complete when IBM has:
installed and configured filesets on the management server as specified in the IBM Systems
Director Installation Plan; and
delivered the IBM Systems Director Installation Record to Customer Point of Contact.
Deliverable Materials:
IBM Systems Director Installation Record
3.2.2 Customer Responsibilities
Project Kickoff and Planning
You agree to:
a. ensure your personnel assigned to this project are available for the duration of the planning session;
b. provide detailed configuration information for any existing or “on order” systems to be included as
part of the Services;
c. provide necessary information for the IBM team to complete the IBM Systems Director
Implementation Worksheets; and
d. have all the following prerequisite hardware installed and operational at your location prior to the
commencement of the Installation and Configuration activity.
Installation and Configuration
You agree to:
identify up to two members of your systems operation staff to receive basic skills instruction. These staff
members must have basic knowledge of the software products being installed as part of this activity;
e. provide assistance, if any network ports are found to be blocked which are necessary for IBM
Systems Director, by unblocking respective ports which will be communicated by the IBM team; and
f. provide internet access to the IBM team to download the necessary software packages required for
IBM Systems Director, if applicable;
g. be responsible for conducting regular backups and maintaining appropriate backup recovery
procedures at your location. The Services are not a substitute for regular data backups and
standard backup and recovery procedures; and
h. specify IBM Systems Director settings ports, filters, traffic direction, rules, and network address
translation specifications, if any.
4. Deliverable Materials
The Deliverable Materials, identified as Type II Materials, resulting from the completion of these Services
will be:
IBM Systems Director Installation Plan
IBM Systems Director Planning Worksheets
IBM Systems Director Installation Record
See Appendix A, “Deliverable Materials Guidelines”, for a description of each deliverable.
5. Completion Criteria
IBM will have fulfilled its obligations for the Services described in this SOW when any one of the following
first occurs:
a. IBM completes the activities described in this SOW, including provision of the deliverable Materials;
or
b. the Services are terminated in accordance with the provisions of the Agreement identified in the
Schedule.
6. Charges
The charges for the Services described in this SOW are detailed in the applicable Schedule.
Z125-8381-00 SOW.doc 11-2009 Page 5 of 5
Appendix A: Deliverable Materials Guidelines
A - 1: IBM Systems Director Installation Plan
Content:
IBM will provide the IBM Systems Director Installation Plan to detail the topics discussed during the
planning session. The IBM Systems Director Implementation Plan will include:
a detailed description of the IBM Systems Director management framework design, including
hardware and software configurations and managed systems topology diagrams.
installation requirements (for example, minimum hardware, software requirements, network
requirements).
list of activities which will be carried out as a part of these Services.
Delivery:
IBM will deliver one copy of the IBM Systems Director Installation Plan, in reproducible format, to
Customer Point of Contact within one week after completion of the “Planning” activity.
A - 2: IBM Systems Director Planning Worksheets
Content:
IBM will provide the IBM Systems Director Planning Worksheets to summarize the configuration defined
during the planning session. The IBM Systems Director Planning Worksheets will consist of configuration
IBM Systems Director implementation including:
management server details
managed systems details
IBM Systems Director process monitoring details
user credentials
event automation plan details
Delivery:
IBM will deliver one copy of the IBM Systems Director Planning Worksheets, in reproducible format, to
Customer Point of Contact within one week after completion of the “Planning” activity.
A - 3: IBM Systems Director Installation Record
Content:
IBM will provide the IBM Systems Director Installation Record which documents the installation and
configuration activities. The IBM Systems Director Installation Record will detail:
software products installed as part of these Services.
configuration activities performed as part of these Services.
monitoring configuration performed as part of these Services.
basic skills instruction provided during these Services
Delivery:
IBM will deliver one copy of the IBM Systems Director Installation Record, in reproducible format, to
Customer Point of Contact within one week after completion of the “Installation and Configuration”
activity.
Login to HandyPDF
Tips: Editig or filling the file you need via PC is much more easier!
By logging in, you indicate that you have read and agree our Terms and Privacy Policy.